Live Data Center Renovation

In order to address a facility with outdated power and cooling infrastructure (with no capacity for growth), PTS needed to perform site upgrades live, while the data center remained operational throughout construction.

We were able to improve the efficiency, resiliency, and reliability of the data center.  PTS installed an upgraded 28kv substation, two critical UPS systems, and implemented an air containment system.

Highlights:

  • Installation of 2 new Critical UPS Systems to create A/B power
  • Increased overall data center reliability from a Tier I to a Tier III with Tier IV attributes
  • Installation of a new utility substation to upgrade the site to 26KV
  • Construction of a high-density zone supporting 10KW Racks by using In-Row Cooling.
  • Efficiency imporovements of +20%

Situation

  • Aging 20 year old primary data center that needed to remain operational throughout construction
  • Operating at the power and cooling limits of existing supporting infrastructure
  • The facility had experienced multiple outages in the past

Impact

  • Increased risk of downtime to operations as a result of higher failure rates
  • Out of power & cooling capacity to support the strategic growth
  • Increased operational costs due to inefficiency and unscheduled maintenance

Resolution

  • Site alternatives were considered and ruled out due to costs
  • Phased-construction approach to tackle the hardest issues first, sequentially building for the next phases of work
  • Installation of 2 new Critical UPS Systems to create A/B power with plans to upgraded further in a future phase
  • Installation of a new utility substation to upgrade the site to 26KV
  • Construction of a high-density zone supporting 10KW Racks with in-row cooling
  • Complete replacement of all critical and emergency power systems along with the accompanying distribution
  • Air Containment and upgrade of traditional perimeter CRAC units was implemented to support the overall 1MW critical load density
  • Efficiency improvements of +20% and increased reliability from Tier I to a Tier III w/ Tier IV attributes

Our primary markets include:

  • Manufacturing and Industrial Facilities
  • Energy Environmental Programs
  • Infrastructure
  • Technology
  • Office / Corporate Headquarters
  • Government / Public Facilities
  • Financial Services
  • Mission-Critical / Data Center
  • Sustainable Design
  • Laboratory
  • Healthcare
  • Hospitality / Hotel
  • Educational
  • Interiors
  • Historic Retrofit / Renovation
  • Resort / Gaming
  • Residential Developments
  • Retail / Restaurant
  • Religious
  • Exhibitions / Recreation
  • Architectural Lighting Design
  • Special Projects
Network Operations Center - Classroom

PTS has an impressive track record for unique architectural and engineering designs. We specialize in all aspects of architectural as well as mechanical, electrical, and plumbing (MEP) and building services engineering for virtually every type of building or structure.

In addition, we specialize in vendor-neutral design of all systems and sub-systems for all building types.

Further, our architects and engineers thrive on challenge. We aspire to achieve the optimal solution for every project. We do this by using a combination of proven design and engineering principles, processes, experience, and innovative thinking.

Contact PTS for your Next Project

You shouldn’t have to compromise when it comes to your facility. Our expert team assesses your unique needs, and then employs a proven plan that reduces the amount of support infrastructure you will need.

The result is higher efficiency, reduced complexity and better resiliency at lower cost… all at the same time.

Contact us for a quick chat to discuss PTS Design & Engineering services for commercial and industrial projects.

Contact PTS today:
(201) 337-3833

air containment systems
air conditioning

Air Containment Systems

Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey

Read More »
consulting

PTS Site Collection

Visit PTS on the Web PTS Data Center Solutions Managed IT Service Teams Computer Room Design PTS Media Blogs PTS Data Center Solutions’ Data Center

Read More »
PTS Design Engineering Architecture
architectural design

Architecture

Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies

Read More »
Data Center Dynamics
data center cost

The Key to Cutting Data Center Construction Costs? Use Minimal Infrastructure

The average enterprise data center costs between $10 million and $12 million per megawatt to build, with costs typically front-loaded onto the first few megawatts of deployment. Seasoned data center builder Peter Sacco, founder and CEO of PTS Data Center Solutions, claims that it is possible to drive down costs by around 25 per cent or more, simply by being more disciplined on design.

Read More »
air conditioning

Air Flow Management

Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey

Read More »
Webinar Data Center Development Innovation for the New Age of Facilities
Bloom Energy

Webinar: Data Center Development Innovation for the New Age of Facilities

Webinar Data Center Development Innovation for the New Age of Facilities. Learn how end users and providers are determining cloud or on-prem strategies for new facilities coming online, how fully integrated edge developments have changed the need for on-prem solutions, who are changing their migration to the cloud and where the opportunities are for expansions.

Read More »

Situation

  • Have two (2) aging edge data centers, some colocation, & some cloud
  • On-premises infrastructure needs have been shrinking
  • Increased risk of downtime to operations because of higher failure rates
  • Increased operational costs due to increased scheduled and unscheduled maintenance
  • Wasted and unused IT space

Resolution

  • Improved hybrid data center strategy leveraging previous investments
  • Designed and built new edge data center in the mixed-use facility using repurposed adjacent space
  • Refreshed the 18-floor IDF stack

Outcome

  • Updated the strategic plan for data center operations
  • New, reliable, resilient, primary edge data center in the mixed-use facility