  • How would a data center manager proceed if he or she were charged with creating a cost estimate for a data center renovation or new build?
  • Would he look for comparable facilities and try to get information about their construction costs?
  • Would he seek information that would allow him to benchmark the cost of hitting key performance specifications?

Developing a budget for a data center, computer room, or server room upgrade or new build requires understanding an array of items related to the facility supporting infrastructure costs, mechanical & electrical design and engineering costs, commissioning costs, and construction costs. However, in order to understand the size, type of power and cooling density required, and then the engineering and build, data center operators and senior IT and facility managers need to take a step back and fully understand the requirements of IT infrastructure both when the facility opens and several years down the road.

white paper PTS cost estimating sample
Download PTS' Cost Estimating Sample Deliverable

Data center and/or computer room budgeting or cost estimating are accomplished by identifying the key design criteria for the two (2) main areas of the project focus within the overall data center infrastructure and services, the Technology Infrastructure & Services (IT) and the Support Infrastructure & Services (the Facility). The key design criteria are:

Key Design Criteria

Availability Requirements

Power & Cooling Density

Business Objectives

Technology Infrastructure & Services

Support Infrastructure & Services

Data Center Project Budget

Since a data center project typically involves base-building design, Site Selection must also be included as a criterion placed on the overall design.

A computer room project, on the other hand, can be as involved as a project within a bigger base building project or as simple as a relocation and/or upgrade of an existing computer room within an established building space.

PTS’ Data Center & Computer Room Cost Budgeting Service is delivered as part of the Plan step in the even (11) step progression of the data center project process.
Data Center Project Process Data Center Consulting Data Center Design and Engineering Data Center Products Data Center Construction Data Center Commissioning Data Center Implementation Data Center Monitoring and Control Data Center Operations and Maintenance

To perform this service a Feasibility Design is required. In addition, PTS’ Needs and Survey Services are typically prerequisites before being able to deliver a solid data center cost estimate for an upgrade or new build.

Availability Requirements

The first milestone in creating a data center project budget is to determine the Availability Requirement for the facility. While it is common practice to state the need for 7x24xForever availability, the steep cost curve associated with delivering on this expectation must be realized. PTS’ data center classification system is based, in part, on the Uptime Institute’s tier classification system.

Power & Cooling Density

The next step in defining a project budget is to determine the Power Density to be used as a basis for design. The power density can be described as the amount of power delivered to the critical load per unit of area and is directly related to the amount of heat that must be removed via the computer room air conditioner (CRAC) systems. In general, PTS defines power density in terms of Rack Location Units (RLUs). In a typical data processing environment each RLU dissipates 1,500 to 4,000 watts. However, network RLUs, 1U server RLUs, and blade server RLUs consume considerable more power, and therefore dissipate considerably more heat. The uneven distribution of RLU power density is becoming ever more commonplace, and is the number one obstacle in present day data center design.

Business Objectives

The final design criteria component of the project budget is the cost associated with achieving the Business Objectives for the facility. Selection of the network services delivery is what drives the final selection of all network, security, server, storage, access, communications, and monitoring infrastructure to be deployed within the facility. Ultimately, this equipment is the critical load that must be supported by the supporting infrastructure.

Unfortunately, the space requirements for a computer room project are often previously dictated by management and/or the project architect. This complicates the design by restricting the power & cooling density strategy utilized as a criterion. Inevitably, this also increases the overall cost of the project.

Technology Infrastructure & Services (IT)

As shown in the chart at the top of the page, in the design process, data center infrastructure and services are broken down into Technology and Supporting categories for budgeting purposes. The Technology Infrastructure & Services budget is determined by working with IT personnel to identify the existing systems and growth projections, evaluate planned upgrades and improvements, and quantify financial constraints; as well as to correlate how each relate to the core business strategy they support. The technology infrastructure & services budget includes the following elements:

Support Infrastructure & Services (the Facility)

As previously discussed, the Support Infrastructure & Services budget is determined by considering the technology infrastructure, power density, and availability requirement. In general, the higher the power density and/or availability, the greater the support infrastructure required and thereby the higher the overall cost. Within the overall data center infrastructure plans, the support infrastructure & services budget includes the following elements:

  • Project Management
  • Support Infrastructure Systems Design, Engineering & Construction
  • Architectural Design & Construction
  • Support Infrastructure Systems (Power, Cooling, Fire Safety, Architectural, etc.)
PTS Data Center Cost Estimating

Summary for Data Center Cost Estimating

Now that we have the Availability Requirements, Power and Cooling Density, Business Objectives, IT Requirements, and Facility Supporting Infrastructure Requirements, we can complete a Data Center Feasibility Design and, therefore, a Cost Estimate for the upgrade, renovation, or new build. Together, these items are called the Key Design Criteria and lead to the determination of:

  • Space requirements
  • Budget requirements
  • Time requirements

It is difficult to generalize the data center technology infrastructure budget since so much depends on the type of business, the platform utilized, and so on. However, it is not uncommon for the project budget to be ten-of-thousands of dollars per RLU, or thousands of dollars per square foot of raised floor space.

Contact PTS for your Next Data Center Project

You shouldn’t have to compromise when it comes to your data center. Our expert team assesses your unique needs, and then employs a proven data center plan that reduces the amount of support infrastructure you will need.

The result is higher efficiency, reduced complexity and better resiliency at lower cost… all at the same time.

Contact us for a quick chat to discuss how a smarter design for your data center can save you money.

Contact PTS today:
(201) 337-3833

Data Center Dynamics
data center cost

The Key to Cutting Data Center Construction Costs? Use Minimal Infrastructure

The average enterprise data center costs between $10 million and $12 million per megawatt to build, with costs typically front-loaded onto the first few megawatts of deployment. Seasoned data center builder Peter Sacco, founder and CEO of PTS Data Center Solutions, claims that it is possible to drive down costs by around 25 per cent or more, simply by being more disciplined on design.

Read More »
air containment systems
air conditioning

Air Containment Systems

Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey

Read More »
NASA Building 46
case study

NASA Case Study

Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies

Read More »