Data Centers from Edge to Cloud
Our Focus
Integrating design and construction services uses less resources, results in a lower cost, takes less time, and requires minimal business disruption
PTS is committed to excellence in the data center design/build process. Unlike the traditional design-specify-bid-build process, which costs more, takes more time to execute and requires more resources to manage, PTS’ Design/Build Data Center Construction Strategy condenses the exercise into a clear and concise process. By integrating both design and construction services, a tighter schedule can be met, costs can be better controlled and unforeseen problems can be avoided. Our proven methodology is designed to minimize the disruption of your business during deployment.
Our Design/Build Services Include:
- Assessment & Planning
- Design
- Architecture/Engineering
- Equipment Sourcing & Scheduling
- Construction / Installation / Integration
- Commissioning
- Operations & Maintenance
- Monitoring

Our approach to every engagement starts with defining and understanding the project requirements for the data center and identifying the business objectives. This is followed by an assessment and audit of the available assets and inevitable detriments. We then establish the design criteria and create a preliminary design to summarize the associated project build costs.
From this point, the initial design is developed based on the project scope, determined system requirements, and available data center build budget, both time-wise and dollar-wise. A preliminary project timeline is established to minimizing construction time and ensure alignment with the project budget.
PTS maintains relationships with the industries, ‘best-of-breed’, critical infrastructure suppliers, local architect/engineers and construction partners. This ensures you receive the best possible equipment cost, with the most favorable delivery terms and have it installed by the most skilled craftsman.
We protect your data center budget commitments by offering fixed-bid pricing wherever possible. However, for those projects where the design/build scope cannot be fully defined at proposal time, we also offer hourly rates.
PTS understands the only acceptable level of downtime is zero. Your job performance and our reputation depend on it.
Contact PTS for your Next Data Center Project
You shouldn’t have to compromise when it comes to your data center. Our expert team assesses your unique needs, and then employs a proven data center plan that reduces the amount of support infrastructure you will need.
The result is higher efficiency, reduced complexity and better resiliency at lower cost… all at the same time.
Contact us for a quick chat to discuss how a smarter design for your data center can save you money.
Contact PTS today:
(201) 337-3833

Facility Maintenance & Operations Management
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

The Data Center Reimagined: Webinar Recording
In this webinar, Peter Sacco of PTS Data Center Solutions offers groundbreaking views for data center operators pursuing solutions to key operating challenges. Leveraging

Rack-Based Cooling Solutions
Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey solutions for IT environments

Help with High Density Cooling
The power consumed, and heat generated, by the equipment housed in a single server rack enclosure can vary dramatically. Modern servers may demand as

Short Circuit, Coordination, and Arc Flash Studies
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

Server Room Air Conditioning
Heat removal is an essential environmental component of server rooms, yet poor design choices prevent many air conditioning systems from operating at peak efficiency.

Air Conditioning Equipment and Systems
Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey solutions for IT environments

Facility and Site Services
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

The Key to Cutting Data Center Construction Costs? Use Minimal Infrastructure
The average enterprise data center costs between $10 million and $12 million per megawatt to build, with costs typically front-loaded onto the first few megawatts of deployment. Seasoned data center builder Peter Sacco, founder and CEO of PTS Data Center Solutions, claims that it is possible to drive down costs by around 25 per cent or more, simply by being more disciplined on design.

Air Flow Management
Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey solutions for IT environments

Computer Room Design Specialists
Data Centers from Edge to Cloud Our Focus Leveraging integrated IT and facility planning and engineering expertise and experience to create a facility that

Air Containment Systems
Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey solutions for IT environments

Computer Room Fire Protection
Computer room fire protection is a top priority in the data center design process. Today’s data centers and computer rooms are under enormous pressure

Security Systems Design
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

Computer Server Room Design Firm
If your company requires the services of a computer server room design firm with a reputation for quality, look no further than PTS Data Center

IT Design, Installation, & Support Services
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

AlwaysON Primary Power
Mission-Critical Power from Bloom Energy Our Focus We provide a fully-integrated cybersecurity platform that incorporates compliance, detection, and response seamlessly… like no other solution.

Data Center Management
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

About PTS Data Center Solutions
Data Centers from Edge to Cloud PTS is an adaptive, coaching and supportive workplace focused on development, relationships, purposeful work, personal contribution and opportunity.