Data Centers from Edge to Cloud
Our Focus
Integrating design and construction services uses less resources, results in a lower cost, takes less time, and requires minimal business disruption
PTS is committed to excellence in the data center design/build process. Unlike the traditional design-specify-bid-build process, which costs more, takes more time to execute and requires more resources to manage, PTS’ Design/Build Data Center Construction Strategy condenses the exercise into a clear and concise process. By integrating both design and construction services, a tighter schedule can be met, costs can be better controlled and unforeseen problems can be avoided. Our proven methodology is designed to minimize the disruption of your business during deployment.
Our Design/Build Services Include:
- Assessment & Planning
- Design
- Architecture/Engineering
- Equipment Sourcing & Scheduling
- Construction / Installation / Integration
- Commissioning
- Operations & Maintenance
- Monitoring

Our approach to every engagement starts with defining and understanding the project requirements for the data center and identifying the business objectives. This is followed by an assessment and audit of the available assets and inevitable detriments. We then establish the design criteria and create a preliminary design to summarize the associated project build costs.
From this point, the initial design is developed based on the project scope, determined system requirements, and available data center build budget, both time-wise and dollar-wise. A preliminary project timeline is established to minimizing construction time and ensure alignment with the project budget.
PTS maintains relationships with the industries, ‘best-of-breed’, critical infrastructure suppliers, local architect/engineers and construction partners. This ensures you receive the best possible equipment cost, with the most favorable delivery terms and have it installed by the most skilled craftsman.
We protect your data center budget commitments by offering fixed-bid pricing wherever possible. However, for those projects where the design/build scope cannot be fully defined at proposal time, we also offer hourly rates.
PTS understands the only acceptable level of downtime is zero. Your job performance and our reputation depend on it.
Contact PTS for your Next Data Center Project
You shouldn’t have to compromise when it comes to your data center. Our expert team assesses your unique needs, and then employs a proven data center plan that reduces the amount of support infrastructure you will need.
The result is higher efficiency, reduced complexity and better resiliency at lower cost… all at the same time.
Contact us for a quick chat to discuss how a smarter design for your data center can save you money.
Contact PTS today:
(201) 337-3833

Demand Fueling Data Center Building Boom
By Ann Bednarz, NetworkWorld.com, 03/06/2006 Developers are set to break ground in July on a project in Austin, Texas, that’s been conceived as a

Network-Critical Physical Infrastructure
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

HVAC / Mechanical / Plumbing Design & Engineering
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

Audio/Visual Systems Design
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

Computer Room Design Specialists
Data Centers from Edge to Cloud Our Focus Leveraging integrated IT and facility planning and engineering expertise and experience to create a facility that

Server Room Raised Floor
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are greatfor companies and their people… but better

Server Room Cooling Systems
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

Facility Maintenance & Operations Management
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

DCD Talks with PTS and Bloom Energy
Pete Sacco (Founder and President, PTS Data Center Solutions) and Jamie Funk (Head of Sales for Verticals at Bloom Energy) talk to Dan Loosemore of Data Center Dynamics about future-proofing the modern data center using PTS’ Data Center Reimagined approach and Bloom Energy’s fuel-cell and micro-grid solutions.

Computer Room Fire Protection
Computer room fire protection is a top priority in the data center design process. Today’s data centers and computer rooms are under enormous pressure

Data Center Planning and Pre-Design
Data Centers from Edge to Cloud Our Focus PTS is uniquely qualified to help businesses assess their data center and support infrastructure risks, provide

Master Planning and Feasibility Analysis Services
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

Server Room Design
When it comes to server room design, PTS’ broad range of specialized project experience within the data center provides our clients with results that

Telecommunications Systems Design
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

Designing for the Edge Webinar Recording Available
DICE National: Data Center Operations and Cooling Digital Summit recording available: Designing for the Edge with Pete Sacco, President of PTS Data Center Solutions, and other Data Center Professionals.

Data Center Design by PTS
Experts for Your Always Available Data Center With everything PTS does, it believes in challenging the status quo. PTS chooses to think differently by

Short Circuit, Coordination, and Arc Flash Studies
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but

Energy Assessment Service (Facility)
Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies and their people… but