Data Centers from Edge to Cloud

Our Focus

PTS site commissioning services ensure that your systems are installed properly and are performing consistent with their design

Our commissioning experts adhere to a thorough quality management process that validates and documents your systems. Our commissioning methodology covers a wide range of procedures to verify the integrity and performance of your mission critical support infrastructure.

Commissioning Services Include:

  • Commission plan preparation
  • Equipment pre-start-up and start-up procedures
  • Integrated system testing
  • Development of standard operating procedures (SOPs) and operational training
  • Assembly of system
  • Provide ‘as-built’ documentation
  • Load Bank Testing

As you undergo a data center construction project, your choice of data center commissioning agent may be as important as your choice of design firm. Data center commissioning is a rigorous, systematic process to ensure that you get the data center design, equipment interoperability and system redundancy that you paid for. Thus the central role of the commissioning agent firm is to advocate for your data center’s needs and agreed-upon requirements.

Although there are several approaches to commissioning a data center and its facility supporting infrastructure, most approaches are based at least in part on the general ASHRAE guidelines for commissioning a building. The PTS approach includes the following services:

  • Commission Plan Development
  • Commissioning Witnessing & Execution (Levels 1-5)

Commission Plan Development Service

load bank testing

Delivers commissioning plan a tailored to the desired level specific to the requirements of the site and the equipment deployed. The plan defines the scope, schedule, and required resources for the execution of a successful commissioning of the site. The plan is not finalized until accepted by the client and/or their representatives.

Commissioning Service

PTS’ Commissioning Services for data centers and computer rooms provide you with the confidence to know whether your supporting infrastructure components and systems are installed properly, are performing consistent with their design intent, and operate as an integrated system.

Our commissioning experts adhere to a thorough quality management process that validates and documents your systems.

load bank testing

PTS’ Data Center Commissioning Services is the eighth (8) of the eleven (11) step progression of the data center project process. Data Center Implementation Services constitute the pre-installation, installation, testing, and turnover of IT infrastructure within a data center, computer room, server room, or network operations center (NOC) facility.

Data Center Project Process Data Center Consulting Data Center Design and Engineering Data Center Products Data Center Construction Data Center Commissioning Data Center Implementation Data Center Monitoring and Control Data Center Operations and Maintenance

Contact PTS for your Next Data Center Project

You shouldn’t have to compromise when it comes to your data center. Our expert team assesses your unique needs, and then employs a proven data center plan that reduces the amount of support infrastructure you will need.

The result is higher efficiency, reduced complexity and better resiliency at lower cost… all at the same time.

Contact us for a quick chat to discuss how a smarter design for your data center can save you money.

Contact PTS today:
(201) 337-3833

Bloom Energy
Bloom Energy

AlwaysON Primary Power

Mission-Critical Power from Bloom Energy Our Focus We design and build on-site, always-on energy solutions to provide resilient, predictably priced,

Read More »
NASA Building 46
case study

NASA Case Study

Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies

Read More »
Data Center Racks Servers
data center design

Support Infrastructure

Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey

Read More »
Data Center Dynamics
data center cost

The Key to Cutting Data Center Construction Costs? Use Minimal Infrastructure

The average enterprise data center costs between $10 million and $12 million per megawatt to build, with costs typically front-loaded onto the first few megawatts of deployment. Seasoned data center builder Peter Sacco, founder and CEO of PTS Data Center Solutions, claims that it is possible to drive down costs by around 25 per cent or more, simply by being more disciplined on design.

Read More »
PTS Design Engineering Architecture
architectural design

Architecture

Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies

Read More »