Data Centers from Edge to Cloud

Our Focus

To manage a stress-free data cabling installation for your company

Unfortunately, improper data cabling exists in many data centers.  Sometimes companies inherit a mess and are afraid of touching it (“if it ain’t broke, don’t fix it”), while others have poor (or no) plans in place and connect cables haphazardly, resulting in a cabling disaster. Proper organization of these cables is not just for aesthetics; it will actually make your data center more manageable and require much less time for maintenance and support.

The keys to becoming your trusted data cabling provider:

  • Be competitively priced
  • Respond quickly to requests for quotes (RFQs)
  • Produce quality work on time and on schedule
  • Perform exceptional data cabling project management
  • Deliver superior quality control
  • Supply outstanding project closeouts with proper documentation, as built drawings, and test results
Data Cabling

Meanwhile, here are a few before/after photos of two of our many recent data cabling projects.

To this end, PTS’ track record speaks for itself regardless of whether you require union or non-union labor. Our technicians and data cabling project managers are trained and BICSI certified to ensure that every installation we complete is done to exacting standards.

Data Cabling Services

PTS provides a full suite of data cabling services and solutions, whether you require customer premise cabling infrastructure, data center cabling, patch panels, fiber optic splicing and installation, CATV, or other types of cabling deployed.

Certifications and Partners

PTS Data Center Solutions is certified and trained to work with many solutions manufacturers for data cabling projects. These manufacturers are the leading suppliers in the industry for structured cabling solutions and associated products.

Reference Projects

PTS personnel have deployed and managed data cabling projects throughout the New York metro area for over 15 years. Our installers and contractors ensure the highest quality service and strive to exceed your expectations every step of the way.

Before After
Cabling - Before (02) Cabling - After (02)
Follet - Cabling (10)

Data Cabling Services

Data Cabling Case Study

PROBLEM: The client had 48 port stackable POE switches, in a mess of short cords, and angled panels with switches in between.
SOLUTION: PTS re-measured and re-patched side to side, utilizing the preferred high density 48 port POE switches.

Contact PTS for your Next Data Cabling Project

You shouldn’t have to compromise when it comes to your data center. Our expert team assesses your unique needs, and then employs a proven data center plan that reduces the amount of support infrastructure you will need.

The result is higher efficiency, reduced complexity and better resiliency at lower cost… all at the same time.

Contact us for a quick chat to discuss how a smarter design for your data center can save you money.

Contact PTS today:
(201) 337-3833

Data Center Racks Servers
data center design

Support Infrastructure

Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey

Read More »
air containment systems
air conditioning

Air Containment Systems

Data Centers from Edge to Cloud Our Focus Providing infrastructure solutions specializing in highly available, scalable, redundant and manageable, turnkey

Read More »
NASA Building 46
case study

NASA Case Study

Data Centers from Edge to Cloud Our Focus We design, build, and operate data centers that are great for companies

Read More »
Data Center Dynamics
data center cost

The Key to Cutting Data Center Construction Costs? Use Minimal Infrastructure

The average enterprise data center costs between $10 million and $12 million per megawatt to build, with costs typically front-loaded onto the first few megawatts of deployment. Seasoned data center builder Peter Sacco, founder and CEO of PTS Data Center Solutions, claims that it is possible to drive down costs by around 25 per cent or more, simply by being more disciplined on design.

Read More »