Data Center Design by PTS Data Center Solutions, Inc.
Home   PTS Blog   About Us   Contact Us   News/Events   Careers   Request Info   Site Map   Visit PTS on Facebook Follow PTS on Twitter View PTS' YouTube Channel Connect with PTS on LinkedIn Read PTS' Blog
(866) 787‑3271 info@ptsdcs.com
DATA CENTER SERVICES

 
Facility Information Technology  
Facility Information Technology
  • Applications Development
  • Network & Security Design Services
  • Server (KVM) & Serial (Console) Access Systems Design Services
  • Data Center Routing and Switching Design Services
  • Data Center Server Design Services
  • Data Center Storage Area Network (SAN) and Data Protection
    Design Services
  • Network Security Design Services
  • PBX / Voice-over-IP Design Services
 
Facility Information Technology
 

Data Center Relocation by PTS Data Center Solutions, Inc.

Home Data Center Consulting

Data Center Relocation Coordination & Implementation

Download Brochure  Request Contact

Computer Room Relocation Implementation Service

PTS provides comprehensive planning, project management, and implementation services for clients requiring Computer Room Relocation due to consolidations, migrations, acquisitions, business moves, or other strategic business reasons. PTS provides specific technical expertise and labor to prepare all IT and facilities equipment for relocation, load and transport all equipment, re-install and recertify equipment, and document and hand off to client operational and IT personnel.

PTS' Computer Room Relocation Implementation Service provides quality pre-move, move, and post-move services to support computer room relocations which fall within the ninth phase of the PTS data center project process.

Data Center relocations are expensive and require specific expertise and experience. Therefore, we recommend completing these programs using skilled personnel intimately familiar with IT migrations.

PTS fully specifies and implements all elements of the relocation program. Specific activities include:

  • Project Management. Detailed project schedule, team structure, and PTS and Client Requirements are developed. Comprehensive communications across all partners including client, PTS, landlord (if applicable), and other subcontractors are completed by PTS project management personnel as preparation for onsite work is completed.
  • Pre-Move Site Preparation. PTS relocation professionals arrive onsite and perform a pre-move assessment of all infrastructure to verify size, count, physical layout, packing requirements, labeling of all devices, cables, and equipment with specific information for new rack location, position, and integration requirements, path for transport from the facility, cabling requirements, and other facility and IT requirements.
  • Move Plan Creation (if necessary). PTS develops and delivers a complete Move Plan specifying all aspects of the Computer Room Relocation program including labeling, de-installation, packing, transport, unloading, unpacking, re-installation, re-cabling (if separately contracted to do so), re-certification of equipment per the OEM (if optionally contracted to do so), documentation, clean-up, and other miscellaneous tasks associated with the relocation.
  • Move Implementation. PTS personnel perform de-installation, packing, loading, transporting, unloading, re-installation, and recertification of equipment per the Original Equipment Manufacturer.
  • Post-Move Consulting. Project completion activities including punch list completion, move review, documentation, and clean-up.

The full scope of PTS relocation activities are shown in the following diagram:



Features Benefits
Project Management & Communications PTS manages all aspects of the facility and IT infrastructure relocation so clients can concentrate on business-related move elements and maintaining corporate functions during the transition
Defined Relocation Approach By leveraging the PTS data center relocation approach, many typical pitfalls are anticipated in advance, contingency plans are in place, and possible problems are avoided
Defined Roles & Responsibilities All partner, vendor, supplier, subcontractor, and client personnel understand their roles and responsibilities related to the relocation; this clear understanding helps to avoid problems and delays in the project schedule
Pre-move Assessment & Site Preparation PTS prepares the current facility and IT equipment for the relocation including labeling of all equipment; labeling includes device specifications, relocation position, cabling requirements, and other device-specific requirements; this allows PTS to verify proper re-assembly and reduces the overall time to re-establish network devices
Move Implementation Services Efficient management of de-install, load, transport, unload, re-install, and re-cabling (if contracted to provide) shortens the actual network downtime and allows the business to effectively manage business operations during the migration with as few hours of business operational downtime as possible
Recertification of Equipment To maintain warranties and avoid downtime and possible capital expenditures, PTS performs a complete recertification of all relocated equipment per OEM requirements (optional service)
Post-Move Consulting Project completion activities with punch list completion, move reviews, documentation of all relocated elements, clean-up, and client acceptance allows the business to focus back on operations quickly and efficiently

Data Center Relocation Services Brochure
Data Center Relocation Services Brochure
(Registration Required)
To learn more about related PTS Services and Programs, contact us or visit:



Back to the Top





Sign Up for PTS Newsletters Considering Data Center Migration? PTS Media Library
PTS DATA CENTER PROJECT SLIDESHOW
PTS Image Gallery
COMPUTER ROOM
SERVICES
SERVER ROOM &
NETWORK ROOM
SERVICES
DATA CENTER
EDUCATIONAL
RESOURCES
Free Data Center Consultation Virtualization Savings Calculator Data Center Maintenance Management Software (DCMMS) Rack Management Platform (RaMP) from No Limits Software Data Center Education and Training
** SPECIAL **
CFD SERVICES
SUPPORT
1.866.PTS.DCS1
1.866.787.3271
info@ptsdcs.com
Share

Visit PTS on Facebook Follow PTS on Twitter View PTS' YouTube Channel Connect with PTS on LinkedIn Read PTS' Blog
PTS Data Center Solutions, Inc. 568 Commerce Street, Franklin Lakes, NJ 07417
Toll Free: 1.866.PTS.DCS1   Tel: 201.337.3833   Fax: 201.337.4722   Email: info@ptsdcs.com
 
Data Center News & Information | Data Center Consulting | Data Center Design & Engineering | Data Center Project Management
Data Center Construction | Data Center Solutions | Data Center Monitoring & Control | Data Center Operations & Maintenance
 
Request Info About Us Contact Us Site Map
© PTS Data Center Solutions, Inc. All rights reserved.