Data Center Design by PTS Data Center Solutions, Inc.
PTS Data Center Solutions, Inc. Home   PTS Blog   About Us   Contact Us   News/Events   Careers   Request Info   Site Map   Visit PTS on Facebook Follow PTS on Twitter View PTS' YouTube Channel Connect with PTS on LinkedIn Read PTS' Blog
(866) 787‑3271 info@ptsdcs.com
DATA CENTER SERVICES

 
Facility Information Technology  
Facility Information Technology
  • Applications Development
  • Network & Security Design Services
  • Server (KVM) & Serial (Console) Access Systems Design Services
  • Data Center Routing and Switching Design Services
  • Data Center Server Design Services
  • Data Center Storage Area Network (SAN) and Data Protection
    Design Services
  • Network Security Design Services
  • PBX / Voice-over-IP Design Services
 

Data Center, Computer Room, and Server Room Feasibility Consulting Services by PTS Data Center Solutions, Inc.

Home Data Center Consulting

Data Center & Computer Room Project Feasibility Consulting


Download Brochure  Request Contact
  • PTS Cost Estimating Document Sample
    Click to Request a Sample
    Cost Estimating Document
    Is your data center in need of an upgrade?
  • Have you run out of space, power, or cooling in your data center?
  • Are you looking to understand the requirements to design and build a new or upgraded data center?

Specific expertise and experience is necessary to perform Data Center Feasibility Consulting and Studies. Most data center operators have expertise and experience in the Information Technology (IT) area in terms of network services, network engineering, network security, servers, desktop, storage, and other ancillary areas within the IT discipline. However, upgrading or building a new data center requires different skills in terms of power, space, cooling, fire suppression, computational fluid dynamics, data center architecture, commissioning of facility supporting infrastructure, just to name a few of the disciplines.

Therefore, it is an excellent idea to consider reaching out to a data center consulting team to provide these facility supporting infrastructure and architectural capabilities. The consultants will approach Data Center Feasibility Consulting by identifying the key design criteria for the two (2) main areas of the project focus within the overall data center infrastructure and services, the Technology Infrastructure & Services (IT) and the Support Infrastructure & Services (the Facility). The key design criteria are:

Key Design Criteria

Availability Requirements

Power & Cooling Density

Business Objectives

Technology
Infrastructure & Services

Support
Infrastructure & Services

Data Center Project Budget

Since a data center project typically involves base-building design, Site Selection must also be included as a criterion placed on the overall design.

A computer room project, on the other hand, can be as involved as a project within a bigger base building project or as simple as a relocation and/or upgrade of an existing computer room within an established building space.

PTS’ Data Center Feasibility Consulting services leverage the first four (4) of the eleven (11) step progression of the data center project process. Feasibility consulting includes Needs Analysis, Site Surveys (if an existing infrastructure is to be upgraded), expert Assessment Services of the data center, computer room, server room, or other mission critical facility, and planning.

Data Center Project Process Data Center Consulting Data Center Design and Engineering Data Center Products Data Center Construction Data Center Commissioning Data Center Implementation Data Center Monitoring and Control Data Center Operations and Maintenance

The PTS services provided for a typical data center / computer room, planning / feasibility project engagement are as follows:

  • Key Design Criteria (KDC) Development Service
    (Establish Load, Availability, and Deployment Density Design Criteria)
  • Site Survey Service
    (Survey the Existing Conditions to Establish Facility Constraints)
  • Assessment Services
    (Establish Recommendations for Upgrade and/or Improvement)
  • Conceptual Design with CFD Modeling
    (Establish a Visual Representation of the Recommendations and Verify Design Considerations using CFD Models)
  • Project Cost Estimating Service
    (Establish a Project Cost Estimate Including All Hardware, Labor, and Professional Services)
  • Preliminary Master Project Schedule Development Service
    (Establish a Preliminary Schedule to Understand the Project Timeline)

Key Design Criteria Development Service

data center availability and risk assessment
The first milestone in creating a data center project feasibility design is to determine the Key Design Criteria for the facility. PTS has a proprietary approach to classifying client Availability Requirements which are, in part, based upon the Uptime Institute’s tier classification system. However, PTS leverages many years of experience in designing and building data centers that are classified as Tier I, II, III, or IV to focus upon key elements for a particular client’s requirement rather than being forced to a specific Tier rating level.

For example, PTS engineers and architects may talk in terms of designing a data center meeting Tier II requirements with certain Tier III attributes per the Uptime Institute rating approach. Across the board Tier III attributes may not be needed but certain redundancy in the power path may be necessary to meet a specific client’s Availability Requirements.

Key design criteria development is a process of interviewing the project stakeholders with the goal of establishing the critical load, site availability requirements, and IT equipment deployment density for a specific computer room improvement, expansion, or new construction project. Additionally, PTS uses these high-level decisions as parameters in a cost model matrix to identify their effect on overall project costs across multiple scenarios, thus allowing the client to narrow the scope of the project to one that is affordable, yet meets the business’ needs.

Ultimately, time spent understanding how load, availability, and density affect the project cost will save you both time and money in the end. Changes to the scope, midway through the construction phase, cause most project cost overruns. PTS’ Key Design Criteria (KDC) Development Service will help you avoid this pitfall by establishing project feasibility via a high-level cost analysis that leads to an early alignment of scope, schedule, and budget.

Site Survey Service

data center planningIf there is an existing site, PTS will field survey the existing conditions of the data center facility, including all computer rooms and supporting spaces as well as its supporting infrastructure and compile a list of findings including identification of critical and non-critical deficiencies as well as the risks to the overall availability of the site.

The intent of this service is to establish a baseline of the existing conditions to serve as a basis for determining a set of Program Requirements, a Conceptual Design & Project Budget, and ultimately design documents when considered in combination with the project’s key design criteria definition.

Assessment Service

PTS’ data center assessment services provide a company with a non-biased, independent assessment of the current data center, computer room, and/or mission critical technical space, including sections of findings, critical deficiencies, and recommendations for upgrades and enhancements to mitigate scheduled and/or unscheduled downtime. Completion of this service requires both PTS’ Site Survey Service (to gather existing conditions information) and Key Design Criteria Services (establish design requirements) as prerequisites before recommendations can be made.

Conceptual Design Service with CFD Modeling

data center conceptual designPTS provides a conceptual design of a new and/or upgraded data center as a culmination of previously established information gathered during the Site Survey, Assessment, and Key Design Criteria phases.

The goal of the conceptual design phase is to articulate in diagram format the narrowed project scope by detailing the components and systems that will comprise the project budget, thereby saving overall project cost.

PTS works with the client to determine the layout of the data center, including the space required for IT personnel, storage, and staging, the space required for computer rooms, the location of the IT equipment in the computer room(s), the size of the support infrastructure equipment, and the service areas around each piece of equipment. PTS then defines the space requirement for any mechanical, electrical, and/or support rooms and performs Computational Fluid Dynamics analysis to validate the cooling approach supports the IT infrastructure, eliminating hot spots in the design and providing proper cooling to all racks within the facility.

Project Cost Estimating Service

PTS works with your team to establish a +/- 15% accurate, line item detail, project budget based on the previously created Conceptual Drawings. Our cost data is established from years of experience working hundreds of budgets, and having the benefit of involvement in the design, and/or construction of millions of square feet of data center space.

A cost estimate this early project’s development provides the client with adequate cost data to complete their analysis as to the financial feasibility of continuing with the project for a specific design condition. Experience dictates it is far less expensive to make substantial changes to the project’s underlying Key Design Criteria (KDC) (load, availability, & deployment density) and Conceptual Design methodology now rather than later in the project process.

Preliminary Master Project Schedule Development Service

PTS will work with your team to establish a preliminary master project schedule based on the previously created Conceptual Design and Budget. Our timeline data is established from years of experience working hundreds of schedule, and having the benefit of involvement in the design and/or construction of millions of square feet of data center space.

A project schedule this early project’s development provides the client with adequate timeline data to complete their analysis as to the time feasibility of continuing with the project for a specific design condition. Experience dictates it is far less expensive to make substantial changes to the project’s underlying Key Design Criteria (KDC) (load, availability, & deployment density) and Conceptual Design methodology now rather than later in the project process.

To learn more about other PTS Data Center Feasibility Consulting and other Data Center Design & Build Services, contact us or visit:


Back to the Top




PTS Smart Open Lease Sign Up for PTS Newsletters data center cabling services PTS Media Library
PTS DATA CENTER PROJECT SLIDESHOW
PTS Image Gallery
COMPUTER ROOM
SERVICES
SERVER ROOM &
NETWORK ROOM
SERVICES
DATA CENTER
EDUCATIONAL
RESOURCES
Free Data Center Consultation Virtualization Savings Calculator Data Center Maintenance Management Software (DCMMS) Rack Management Platform (RaMP) from No Limits Software Data Center Education and Training
** SPECIAL **
CFD SERVICES
SUPPORT
1.866.PTS.DCS1
1.866.787.3271
info@ptsdcs.com
Share

Visit PTS on Facebook Follow PTS on Twitter View PTS' YouTube Channel Connect with PTS on LinkedIn Read PTS' Blog
PTS Data Center Solutions, Inc. 16 Thornton Road, Oakland, NJ 07436
Toll Free: 1.866.PTS.DCS1   Tel: 201.337.3833   Fax: 201.337.4722   Email: info@ptsdcs.com
 
Data Center News & Information | Data Center Consulting | Data Center Design & Engineering | Data Center Project Management
Data Center Construction | Data Center Solutions | Data Center Monitoring & Control | Data Center Operations & Maintenance
 
Request Info About Us Contact Us Site Map
© PTS Data Center Solutions, Inc. All rights reserved.