Data Center Design by PTS Data Center Solutions, Inc.
PTS Data Center Solutions, Inc. Home   PTS Blog   About Us   Contact Us   News/Events   Careers   Request Info   Site Map   Visit PTS on Facebook Follow PTS on Twitter View PTS' YouTube Channel Connect with PTS on LinkedIn Read PTS' Blog
(866) 787‑3271 info@ptsdcs.com
DATA CENTER SERVICES

 
Facility Information Technology  
Facility Information Technology
  • Applications Development
  • Network & Security Design Services
  • Server (KVM) & Serial (Console) Access Systems Design Services
  • Data Center Routing and Switching Design Services
  • Data Center Server Design Services
  • Data Center Storage Area Network (SAN) and Data Protection
    Design Services
  • Network Security Design Services
  • PBX / Voice-over-IP Design Services
 

Data Center Cooling Renovation by PTS Data Center Solutions, Inc.

Home Data Center Consulting

Data Center Cooling Renovation

While most of the time renovating or upgrading data center cooling is due to outdated or out-of-warranty solutions, more data center operators are looking to deploy high density IT infrastructure. Infrastructure such as blade servers put significant cooling demands on legacy data center cooling solutions such as room- or row-based cooling solutions. These solutions are less able to support required cooling. High density IT infrastructure poses a challenge due to the need for precision-based cooling at the rack level.

PTS Data Center Solutions engineers are familiar with the latest approaches to data center cooling including rack-based cooling solutions , in-row cooling solutions , air flow management , and next generation approaches to increase the efficiency of cooling solutions (I.e. Powertron Global PermaFrost NMR™ Refrigeration Solutions.

Data Center Cooling Renovations require careful analysis of Key Design Criteria (I.e. what does the IT infrastructure need to today and into the future), engineering analysis & design via Computational Fluid Dynamics (CFD) , and review, design, and engineering of various approaches to cooling renovations.

PTS takes a holistic approach to data center cooling renovations with a focus upon early planning. These facility upgrades are more complex than one thinks and it is critical to have a fundamentally sound data center design process aimed at:

  • Meeting IT support requirements
  • Reducing risk
  • Providing adaptability and scalability
  • Improving maintainability and serviceability
  • Delivering a newly renovated facility which meets the engineered plans

PTS’ Data Center Cooling Renovation approach begins with a thorough planning & feasibility phase prior to implementation of architectural and engineering services. This approach leverages the first five phases of the PTS data center project process for successful planning leading into cohesive design services which support client requirements.

Data Center Project Process Data Center Consulting Data Center Design and Engineering Data Center Products Data Center Construction Data Center Commissioning Data Center Implementation Data Center Monitoring and Control Data Center Operations and Maintenance

The PTS capabilities provided for a Data Center Renovation project include Planning & Feasibility and Design & Engineering as follows:

  • Key Design Criteria (KDC) Development
    (Establish Load, Availability, and Deployment Density Design Criteria)
  • Site Surveys
    (Survey the Existing Conditions to Establish Facility Constraints)
  • Assessment Services
    (Establish Recommendations for Upgrade and/or Improvement)
  • Conceptual Design with CFD Modeling
    (Establish a Visual Representation of the Recommendations and Verify Design Considerations using CFD Models)
  • Project Cost Estimating
    (Establish a Project Cost Estimate Including All Hardware, Labor, and Professional Services)
  • Preliminary Master Project Schedule Development
    (Establish a Preliminary Schedule to Understand the Project Timeline)
  • Architectural & Engineering Design
    (Plan and Engineer Room, Floor, Physical Security, and Other Intrinsic Elements Using Design Approaches Necessary for Mission Critical Facilities)

By focusing early on the KDCs required by IT systems and solutions with an eye on future requirements in years 2 – 5, PTS is able to work with clients to develop and implement Data Center Cooling Renovations that will support requirements for years to come. For example, PTS leverages CFD engineering design techniques to model the existing heat dissipation with current IT loads and considers future IT roll-outs and their impact on the proposed cooling solution implementation. This allows our engineers to make consistent and solid recommendations on cooling system design for today’s load as well as anticipated future loads.

After the design is completed and approved by the client, PTS’s implementation team can handle all necessary upgrades including installation of air containment solutions, upgrades to appropriate cooling systems, installation of next generation refrigeration solutions, and other required cooling renovation upgrades.

Data Center Renovation Temperature Map
Computational Fluid Dynamics (CFD) Modeling

To learn more about PTS’ Data Center Cooling Renovation services and how they can help you meet your Mission Critical Facility Requirements, contact us or visit:

To learn more about PTS recommended Air Conditioning Equipment & Systems, contact us or visit:

Back to the Top





PTS Smart Open Lease Sign Up for PTS Newsletters data center cabling services PTS Media Library
PTS DATA CENTER PROJECT SLIDESHOW
PTS Image Gallery
COMPUTER ROOM
SERVICES
SERVER ROOM &
NETWORK ROOM
SERVICES
DATA CENTER
EDUCATIONAL
RESOURCES
Free Data Center Consultation Virtualization Savings Calculator Data Center Maintenance Management Software (DCMMS) Rack Management Platform (RaMP) from No Limits Software Data Center Education and Training
** SPECIAL **
CFD SERVICES
SUPPORT
1.866.PTS.DCS1
1.866.787.3271
info@ptsdcs.com
Share

Visit PTS on Facebook Follow PTS on Twitter View PTS' YouTube Channel Connect with PTS on LinkedIn Read PTS' Blog
PTS Data Center Solutions, Inc. 16 Thornton Road, Oakland, NJ 07436
Toll Free: 1.866.PTS.DCS1   Tel: 201.337.3833   Fax: 201.337.4722   Email: info@ptsdcs.com
 
Data Center News & Information | Data Center Consulting | Data Center Design & Engineering | Data Center Project Management
Data Center Construction | Data Center Solutions | Data Center Monitoring & Control | Data Center Operations & Maintenance
 
Request Info About Us Contact Us Site Map
© PTS Data Center Solutions, Inc. All rights reserved.