Data Center Design by PTS Data Center Solutions, Inc.
PTS Data Center Solutions, Inc. Home   PTS Blog   About Us   Contact Us   News/Events   Careers   Request Info   Site Map   Visit PTS on Facebook Follow PTS on Twitter View PTS' YouTube Channel Connect with PTS on LinkedIn Read PTS' Blog
(866) 787‑3271 info@ptsdcs.com
DATA CENTER SERVICES

 
Facility Information Technology  
Facility Information Technology
  • Applications Development
  • Network & Security Design Services
  • Server (KVM) & Serial (Console) Access Systems Design Services
  • Data Center Routing and Switching Design Services
  • Data Center Server Design Services
  • Data Center Storage Area Network (SAN) and Data Protection
    Design Services
  • Network Security Design Services
  • PBX / Voice-over-IP Design Services
 

IT Disaster Recovery Assessment Services by PTS Data Center Solutions, Inc.

Home Data Center Consulting

Data Center Disaster Recovery IT Assessment Services


Download Brochure  Request Contact

PTS’ Data Center IT Disaster Recovery Assessment Services provide an analysis and assessment of client data centers, computer rooms, and mission critical facilities and their ability to withstand disasters from the perspective of IT network and systems performance. These services uncover risks and recommend improvements across the enterprise IT network.

The goal of these services are to provide client management with initial observations of the enterprise IT network and systems, to identify risk areas for improvement, and to provide high level recommendations to eliminate the risks and avoid unplanned business operation downtime.

PTS’ Data Center IT Disaster Recovery Assessment Services represent the first, second, and third phases in the eleven (11) step progression of the data center project process. Typically, PTS’ Needs and Survey Services are a prerequisite in delivering our IT Assessment Services.

Data Center Project Process Data Center Consulting Data Center Design and Engineering Data Center Products Data Center Construction Data Center Commissioning Data Center Implementation Data Center Monitoring and Control Data Center Operations and Maintenance

Assuming prior analysis of the impact to the business if a disaster were to occur (natural, terrorist, etc.) and the associated downtime costs are understood, PTS approaches IT Disaster Recovery Assessments with the following consultative approach:

IT disaster recovery assessment services

When coupled with PTS’ Facility Disaster Recovery Assessment Services, PTS is able to provide comprehensive assessments of both the facility supporting infrastructure and IT network and system infrastructure to fully comprehend the cost impact to a business to establish a disaster-proof enterprise IT solution. Unlike other IT consulting and solutions vendors, PTS provides a comprehensive view into the facility infrastructure which supports IT uptime. Together, PTS-provide IT and Facility Disaster Recovery Assessment Services work to support organizational Business Continuity & Disaster Recovery Plans.

flooded data center disaster recovery

Back to the Top

Recovery Objectives

The two key recovery objectives used to measure the effectiveness of an IT Disaster Recovery Program and, therefore, required to fully understand and assess DR readiness for IT enterprise infrastructure are:

  • Recovery Time Objectives (RTO): How long can the business continue to function without the critical IT services (how quickly must we be able to recover the service from the ‘decision to invoke the DR plan?)
  • Recover Point Objective (RPO): From what time in the processing cycle will we recovery data (how much data are we prepared to lose or have to re-enter from an alternate source?)

    There are several options:
    • Zero data loss, recovery to the point of failure
    • Start of the current business Day (SoD)
    • End of the previous business Day (EoD)
    • Intraday, a point between the last available backup either SoD or EoD and the failure, for arguments sake midday
    • Period end, the weekly or monthly backup

Additionally, there is a third measure. This is the Maximum Tolerable Outage (MTO). The MTO is the maximum time the business will survive from the initial service interruption.

The recovery objectives must be based upon solid business requirements identified by the business impact analysis (BIA) process.

IT Disaster Recovery Components

PTS IT Data Center Assessment Services review:

  • Networking Structure
  • Routing Structure
  • Redundancy
  • Network Security
  • Mirrored Infrastructure
  • Time to Implement
  • Fault Tolerance
  • Manageability

To learn more about other PTS IT Disaster Recovery Assessment Services and Programs, contact us or visit:


Back to the Top




PTS Smart Open Lease Sign Up for PTS Newsletters data center cabling services PTS Media Library
PTS DATA CENTER PROJECT SLIDESHOW
PTS Image Gallery
COMPUTER ROOM
SERVICES
SERVER ROOM &
NETWORK ROOM
SERVICES
DATA CENTER
EDUCATIONAL
RESOURCES
Free Data Center Consultation Virtualization Savings Calculator Data Center Maintenance Management Software (DCMMS) Rack Management Platform (RaMP) from No Limits Software Data Center Education and Training
** SPECIAL **
CFD SERVICES
SUPPORT
1.866.PTS.DCS1
1.866.787.3271
info@ptsdcs.com
Share

Visit PTS on Facebook Follow PTS on Twitter View PTS' YouTube Channel Connect with PTS on LinkedIn Read PTS' Blog
PTS Data Center Solutions, Inc. 16 Thornton Road, Oakland, NJ 07436
Toll Free: 1.866.PTS.DCS1   Tel: 201.337.3833   Fax: 201.337.4722   Email: info@ptsdcs.com
 
Data Center News & Information | Data Center Consulting | Data Center Design & Engineering | Data Center Project Management
Data Center Construction | Data Center Solutions | Data Center Monitoring & Control | Data Center Operations & Maintenance
 
Request Info About Us Contact Us Site Map
© PTS Data Center Solutions, Inc. All rights reserved.